Panel and pivot position
The visible panel width is not the same as the clear passage when the door opens. Review the pivot offset and walking path before choosing the size.
Create a distinctive entrance with a pivot door planned around the opening, hardware and finishes. Capital Construction Team helps homeowners in Broward and Palm Beach review the details before committing to a custom door system.

Licensed and Insured · Florida General Contractor CGC1538045
Tell us about your project.
Or call (954) 228-3703
We use your details to respond to your project inquiry.
Capital Construction Team · CGC1538045
A pivot door rotates around a pivot axis rather than relying on a conventional row of side hinges. That movement is part of its appeal, but it also makes careful planning essential. The panel dimensions and pivot position influence the passage and the space needed on both sides of the door.
We review the proposed system and existing entrance together. The goal is to bring the door, supporting surfaces, threshold, weather sealing and hardware into one installation plan, with the surrounding work clearly described in your proposal.
The visible panel width is not the same as the clear passage when the door opens. Review the pivot offset and walking path before choosing the size.
Compare the panel finish, pull handle and frame details as a complete entrance. We discuss how the door will look and operate from inside and outside.
Hardware requirements vary by system. We review the manufacturer’s details and the conditions at the opening before defining preparation and installation work.
Pivot describes the door’s operation, not its impact rating or suitability for every exterior opening. For a South Florida entrance, we review the exact product documentation and the requirements for your property before recommending a system. We do not assume that an oversized or custom pivot door is impact rated.
Discuss My Door ProjectWe keep the product decisions, opening preparation and installation work connected, so you understand what happens next.
We review your goals, measure the opening and discuss a suitable door configuration.
Confirm the selected product, preparation, finishes and installation scope before ordering.
We coordinate the agreed project requirements and install the selected system.
We check the door’s operation with you and review the completed scope and care information.
That depends on the opening, proposed panel and hardware requirements. We need to review the complete system and site conditions before confirming it.
No. The pivot action does not establish an impact rating. Any required exterior performance must be confirmed for the exact selected assembly.
Send the manufacturer, model, dimensions and available technical documents. We review the installation requirements and site before confirming the scope.
Possibly, depending on the selected door and existing conditions. Any change to the opening or supporting construction is reviewed and priced separately from a straightforward replacement.
Based in Deerfield Beach, Capital Construction Team works with homeowners in Boca Raton, Parkland, Lighthouse Point and surrounding South Florida communities. Share your city and photos of the opening so we can discuss the next step for your property.
Explore our service areasTell us about your opening, the style you have in mind and where the property is located. We will help you understand the product choices and installation scope.